generator pasifik indonesia
Jun 6, 20231 min read
PCI CONTAINERIZED DOCS 500 (CDOCS) COMPLETE AND READY FOR DELIVERY!
PCI has successfully manufactured and tested the first turn-key containerized DOCS 500 (CDOCS) systems, along with high-pressure boosters...
generator pasifik indonesia
Jul 21, 20221 min read
Installation of VSA Docs 500 Oxygen Generator Machine in Sintang
The government and local hospitals took steps to produce oxygen independently by installing the VSA Docs 500 oxygen generator engine. The...
generator pasifik indonesia
Apr 20, 20221 min read
VSA Docs 500 Oxygen Generator Machine Installation in Kota Baru
The oxygen needs in the Kota Baru area, PT Generator Pasifik Indonesia installed the O2 PCI Generator VSA DOCS 500 engine. Here are the...
generator pasifik indonesia
Mar 31, 20221 min read
Operation installation of oxygen machine installation in Lubuklinggau
Installation of oxygen generator engine at Lubuklinggau Hospital, South Sumatra.vsa Docs 500 engine specifications:Flow/capacity: 500 LPM...
generator pasifik indonesia
Mar 21, 20221 min read
Installation of Oxygen Machines in Gorontalo
PT Generator Pasifik Indonesia procures and installs VSA Docs 200 (200 LPM) oxygen generator engines which are expected to be able to...
generator pasifik indonesia
Apr 27, 20211 min read
Site Visit Unit @ Indonesia Power Grati
Project detail of power plant IP GRATI operates a Gas Power Plant (PLTG), Gas & Steam Power Plant (PLTGU) and Steam Power Plant (PLTU)...
generator pasifik indonesia
Apr 27, 20211 min read
Site Visit Unit @ Indonesia Power Semarang
Project detail of power plant Semarang Power Generation Unit (PGU) operates a Gas Power Plant (PLTG), Gas & Steam Power Plant (PLTGU) and...
generator pasifik indonesia
Apr 23, 20211 min read
Commissioning @ TJB 5&6 Jepara
Project detail of power plant Tanjung Jati B power station is a 2,640 megawatt (MW) coal-fired power station located in Central Java...
generator pasifik indonesia
Mar 29, 20211 min read
Commissioning @ PJB Muara Karang
Mr. Dian and Mr. Rizky was checking up on Indonesia Power at Muara Karang for 8000 hours machine H2 (Titan) maintenance. They was doing...